EasyAdditional Assistant Engineer (Electrical)2026✓ Editorially verified
PDF
Maximum Demand / Connected Load
In a power system, the demand factor is the ratio of the:
⚑ Report issue
Found a wrong answer, translation, image or source problem? Send it to editorial review.

