With reference to "Green Energy Open Access" in Gujarat, consider the following:1.Any consumer with a load of 100 kW or above can opt for Green Energy Open Access.2.There are no limit restrictions for residential consumers.3.Cross-subsidy surcharge is completely waived for Green Energy Open Access for all consumer categories.Which of the statements given above is/are correct?

⚑ Report issue

Found a wrong answer, translation, image or source problem? Send it to editorial review.

Sign in to submit a report
Answer & Explanation
Correct AnswerC. 1 only

Quick Explanation

Green Energy Open Access permits eligible consumers to procure renewable electricity through open access subject to regulations, network feasibility and applicable charges. The 100 kW contracted-demand/sanctioned-load threshold is a key eligibility point in the Green Energy Open Access framework, while blanket claims that every category is exempt from cross-subsidy surcharge are incorrect.

Exam focus: Check threshold, captive exceptions and surcharge provisions separately. Common trap: Green open access does not mean all charges are automatically waived.

Formula / Key Relation

Eligibility/charges are regulatory and category-specific.

Detailed Explanation

Correct Answer: C - 1 only Quick Concept Explanation Green Energy Open Access permits eligible consumers to procure renewable electricity through open access subject to regulations, network feasibility and applicable charges. The 100 kW contracted-demand/sanctioned-load threshold is a key eligibility point in the Green Energy Open Access framework, while blanket claims that every category is exempt from cross-subsidy surcharge are incorrect.Exam focus: Check threshold, captive exceptions and surcharge provisions separately. Common trap: Green open access does not mean all charges are automatically waived. Statement-wise Verification Statement 1 - Correct.Any consumer with a load of 100 kW or above can opt…

SEO + Knowledge GraphRelated PYQs & Exam ContextExam path, knowledge path and deeper practice links.
1Previous Exam Appearances
6All Related Questions
99Content Quality

Previous Exam Appearances

Deputy Executive Engineer (Electrical), Class-2, Sports Authority of Gujarat / Assistant Engineer (Electrical), Class-2,2026Q. 190

More Questions From This Concept

Ready for exam mode?Practice this knowledge in Premium Mock Tests
Open Mock Tests →